Net metering and net billing in Cyprus: what changed and what it means for your panels

Checked 18 Nov 2026. This is general information, not advice; ask a qualified professional. The official source is the Electricity Authority of Cyprus (EAC).

The short answer

  • Net metering has closed. The EAC says the scheme expired on 31 December 2025.
  • If you applied by 31 December 2025, the EAC still offers you a net metering or virtual net metering agreement.
  • If you are fitting panels now, ask the EAC which scheme applies to you. Its renewable energy page lists net billing and virtual net billing.

If you applied for net metering in time, keep a copy of your agreement and ask the EAC in writing about any change to its terms.

What net metering was

Net metering was the earlier scheme for homes and other premises that produce their own renewable electricity. The EAC page lists these limits:

  • Household PV: up to 10 kW.
  • Virtual net metering: up to 10.4 kWp for domestic use.

The EAC announced the end date on 30 September 2025. Net metering and virtual net metering agreements are now offered only to customers who applied for connection by 31 December 2025.

Net billing: what the EAC lists

The same EAC page also lists:

  • Net billing: for systems up to 8 MW.
  • Virtual net billing: up to 150 kWp per consumption bill and per beneficiary.

Ask before you sign

Ask your installer and the EAC to show you, in writing:

  • the rate your exported electricity is credited at;
  • how long the contract lasts.

Net metering vs net billing: side by side

Net metering Net billing
Open to new applications? No, expired 31 Dec 2025 Listed by the EAC; ask which applies to you
Size limit (EAC) 10 kW household Up to 8 MW
Virtual version Up to 10.4 kWp domestic Up to 150 kWp per bill

Curtailment: when your panels are switched off

The EAC says the system operators "reserve the right to limit (at any time and without restriction)" the renewable energy fed into the grid. This is called curtailment.

The EAC publishes notices of PV disconnections. In September 2026 it posted several, covering systems from 0 to 499 kWp in various areas. A regulator decision, CERA Regulatory Decision 189/2023, requires monthly data on curtailed energy.

If your panels stop exporting on a sunny day, check the EAC's announcements before calling an installer.

What it means for your panels

You are on net metering already

  • Keep a copy of your agreement.
  • If you plan to add panels or a battery, ask the EAC first whether the change affects your agreement.

You are fitting panels now

  • Ask the EAC which scheme your system will join before you sign with an installer.
  • Ask your installer whether a battery suits the way you use power. See our Batteries, generators and backup power trade.
  • The 2026 Save and Upgrade in Homes grant lists PV under net billing and battery storage among the eligible works, for homes that meet its rules. See grants for homes in Cyprus.

Choosing an installer

  • Electrical work may only be done by people registered with the Electrical and Mechanical Services (EMS). Ask to see the registration.
  • Registration as a small-scale renewable energy installer is voluntary under Law 107(I)/2022, so an installer missing from that register can still be properly registered for electrical work. See Business in Cyprus: small-scale RES installers.
  • Get a written quote that names the system size in kWp, the inverter, and who handles the EAC application.

Useful EAC number

  • 1800: EAC Distribution, for faults

Next step

Find an installer near you: Solar panels (PV) in Cyprus.

Sources

  1. Electricity Authority of Cyprus: Net Metering, read 18 Nov 2026
  2. Electricity Authority of Cyprus: Renewable energy sources (distribution), read 18 Nov 2026
  3. Electricity Authority of Cyprus: Public relations announcements (PV disconnection notices), read 18 Nov 2026
  4. Business in Cyprus (gov.cy): Renewable energy systems, small-scale installers, read 18 Nov 2026
  5. CyLaw: Law 107(I)/2022, Art 36(2) (registration of installers is voluntary), read 17 Nov 2026
  6. Business in Cyprus (gov.cy): Electrical services professionals, read 17 Nov 2026
  7. Funding Programmes Portal (gov.cy): Save and Upgrade in Homes (2026), read 18 Nov 2026